Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Bao, F, Chen, C, Chan, A P, Martek, I and Shrestha, A (2019) Dynamic framework transfer model for public–private partnerships. Engineering, Construction and Architectural Management, 26(07), 1218–39.

Chen, C, Tang, L, Hancock, C M and Zhang, P (2019) Development of low-cost mobile laser scanning for 3D construction indoor mapping by using inertial measurement unit, ultra-wide band and 2D laser scanner. Engineering, Construction and Architectural Management, 26(07), 1367–86.

Chen, K and Lu, W (2019) Bridging BIM and building (BBB) for information management in construction. Engineering, Construction and Architectural Management, 26(07), 1518–32.

Cui, Z, Liu, J, Xia, B and Cheng, Y (2019) Beyond national culture difference. Engineering, Construction and Architectural Management, 26(07), 1476–97.

Khattak, M S and Mustafa, U (2019) Management competencies, complexities and performance in engineering infrastructure projects of Pakistan. Engineering, Construction and Architectural Management, 26(07), 1321–47.

Leung, M, Famakin, I O and Wang, C (2019) Developing an integrated indoor built environment–quality of life model for the elderly in public and subsidized housing. Engineering, Construction and Architectural Management, 26(07), 1498–517.

  • Type: Journal Article
  • Keywords: Architecture; Elderly; Quality of life; Built environment; Facilities; Design management; Questionnaire survey; International practice; Public and subsidized housing;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-02-2018-0054
  • Abstract:
    The growth rate of the aging population raises the demand for and challenges of public and subsidized (P&S) housing for the elderly. The decline in elderly ability increases their dependence on the quality of facilities provided by their residential apartment. Hence, the purpose of this paper is to develop an integrated indoor built environment–quality of life model for the elderly in P&S housing estates. Design/methodology/approach A questionnaire survey, including scales for 4 quality of life (QoL) domains (physical health, psychological health, social relationships and overall QoL), and 13 indoor built environment (BE) components were identified. In total, 365 survey data were collected from the elderly in 18 political districts of Hong Kong, while reliability analysis, multiple regression analysis and structural equation modeling were adopted in the data analysis. Findings Based on the congruence of results of these statistical analyses, it was revealed that: furniture and fixtures predict all the four QoL domains of the elderly; lighting and color induce social relationships; and overall QoL is predicted by distance and handrails. Originality/value Several recommendations were made in accordance with the research results, such as review minimum spacing requirements to provide walking distance for elderly physical activity, investigate the micro-climate for appropriate building orientation, consider the changing body size of the elderly for supply of furniture, use warm colors with high levels of illumination, and so on.

Liu, N, Ruan, L, Jin, R, Chen, Y, Deng, X and Yang, T (2019) Investigation of individual perceptions towards BIM implementation-a Chongqing case study. Engineering, Construction and Architectural Management, 26(07), 1455–75.

Nasirzadeh, F, Carmichael, D G, Jarban, M J and Rostamnezhad, M (2019) Hybrid fuzzy-system dynamics approach for quantification of the impacts of construction claims. Engineering, Construction and Architectural Management, 26(07), 1261–76.

Olatunji, O A (2019) Promoting student commitment to BIM in construction education. Engineering, Construction and Architectural Management, 26(07), 1240–60.

Salama, T and Moselhi, O (2019) Multi-objective optimization for repetitive scheduling under uncertainty. Engineering, Construction and Architectural Management, 26(07), 1294–320.

Sun, H, Wang, Y and Meng, J (2019) A trading and pricing method of expansion options for BOT freeway projects in China. Engineering, Construction and Architectural Management, 26(07), 1406–23.

Tayeh, B A, Hallaq, K A, Zahoor, H and Al Faqawi, A H (2019) Techniques and benefits of implementing the last planner system in the Gaza Strip construction industry. Engineering, Construction and Architectural Management, 26(07), 1424–36.

Uusitalo, P, Seppänen, O, Peltokorpi, A and Olivieri, H (2019) Solving design management problems using lean design management: the role of trust. Engineering, Construction and Architectural Management, 26(07), 1387–405.

Wang, Y and Jin, X (2019) Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example. Engineering, Construction and Architectural Management, 26(07), 1348–66.

Yu, J, Ma, G and Cai, S (2019) Disparities in the provision of aging-friendly communities in old and new urban neighborhoods in China. Engineering, Construction and Architectural Management, 26(07), 1277–93.

Zhang, J, Xie, H and Li, H (2019) Improvement of students problem-solving skills through project execution planning in civil engineering and construction management education. Engineering, Construction and Architectural Management, 26(07), 1437–54.